Project Oil project
ininital product
finit product
-
power cost
2.0
cost coef
5.00
Calculate
Models
Model
| Created | Initial product | Finit product | Total capex | Value | Power | reg opex | reg income | reg power cost | building delay | Payback | Bottleneck node |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-06-21 14:18:37 | Well fluid | Pipeline-grade oil | 770_885.00 | 60.00 | 201_758.00 | 404_156.00 | 539_400.00 | 403_516.00 | 2.0 | 7.6999571145485195 | Stage separation unit / Stabilization unit |
| 2026-06-21 14:18:37 | Well fluid | Crude oil emulsion | 256_450.00 | 73.00 | 80_849.00 | 161_998.00 | 0.00 | 161_698.00 | 2.0 | 0.0 | GOSP — Gas Oil Separation Plant |
| 2026-06-21 14:18:37 | Well fluid | Stabilized crude oil | 362_365.00 | 60.00 | 145_739.00 | 291_823.00 | 0.00 | 291_478.00 | 2.0 | 0.0 | Stage separation unit / Stabilization unit |